UMW Aerospace Serendah Factory, Malaysia
Dunkirk LNG terminal, France
Sophie Fromion2022-04-06T13:12:09+02:00Reinforcing the ground for a new dock in Dunkirk, France
Port of Dunkirk, France
Sophie Fromion2021-07-01T12:10:33+02:00"Stand-down" operation for the reinforcement of the Freycinet 8 quay The project aimed to reinforce the quay under the crane circulation area used to unload wind turbine from boats. The 6,500 sq. metre area, composed of loose and dense sand down to 5 m, had to be executed in less than 3 weeks. Menard’s [...]
Windmills, Lautsitz Ring, Germany
Sophie Fromion2022-04-05T16:54:46+02:00Vibrocompaction: new record of depth The largest onshore windmill with 7.5 MW is installed on top of an old brown coal dump area. A combination of vibrocompaction up to 68 m deep and additional stone columns 20 m deep were installed night and days. This is a new record of depth and improvement quality in [...]
Aubagne LRT maintenance center, France
Sophie Fromion2022-04-06T13:18:02+02:00Bulk excavation and ground improvement works, Aubagne, France
Spaceship Ariane 5 launch pad in Kourou, French Guyana
coralielaval2021-12-22T10:35:22+01:00Foundations of one of the most heavily loaded railways in the world For the foundations of one of the most heavily loaded railways in the world (2,000 tons of the space rocket), Menard developed an alternate solution combining dynamic replacement and vertical drains as an alternative to excavation and replacement of the mangrove, a [...]
Nice Airport, France
Sophie Fromion2021-07-01T14:51:48+02:00Iconic project : Nice airport, France Deepest dynamic compaction application (27 m, 4,000 tm energy) on the Nice airport, France project The 'giga-machine' was designed and custom-built for this site The challenge was to compact 20,000,000 m³ of land reclamation while maintaining air traffic. The 'giga-machine' was designed and custom-built for this job. The [...]
Changi Airport, Singapore
Sophie Fromion2021-07-01T17:31:57+02:00Ground improvement under the second runway of Changi airport For the construction on the second runway of Changi airport, 7 m of hydraulic fill were placed over varying layers of both old and recent marine clays. Settlement of these clays could amount to several metres over a ten year period. The combination of dynamic [...]
Palm Jumeirah and Jebel Ali, Dubai
coralielaval2021-07-01T14:49:57+02:00Supporting economic development in Dubai The Palm Jumeirah and Jebel Ali are iconic developments of Dubai consisting in the reclamation and development of artificial islands near the shores of Dubai. Vibrocompaction Ltd, a Menard affiliated company, undertook the vibrocompaction of part of the Palm Jumeirah and the entire Palm Jebel Ali for a volume [...]
SEA Tours-Bordeaux HSL, France
coralielaval2022-04-05T15:54:57+02:00Soil expertise serving high-speed rail The largest project of its type in Europe, the South Europe Atlantic high-speed line will reduce travel time between Paris and Bordeaux. Menard improved the ground under the backfill over a height of 5 to 10 metres for the northern and southern access to one of the project’s iconic [...]