Ports Pulaski Warehouse, USA The Prologis Ports Pulaski Warehouse Project, developed by Prologis, Inc., consisted in building an 82,000 sq. metre logistics facility. Up to six drilling machines worked concurrently to improve the foundation soils for the structure by installing about 12,000 Controlled Modulus Columns (CMCs). The site, which rests on former landfill [...]
Port of Dunkirk, France
coralielaval2022-11-28T15:48:53+01:00Port of Dunkirk – Freycinet 8 quay reinforcement The project aimed to reinforce the quay under the crane circulation area used to unload wind turbine from boats. The 6,500 sq. metre area, composed of loose and dense sand down to 5 m, had to be executed in less than 3 weeks. Menard’s solution [...]
Port of Dakar, Senegal
coralielaval2022-11-28T15:44:02+01:00Port of Dakar, Senegal In 2009, DP World started the construction of the “port of the future”, the third container terminal of the port of Dakar. On the same area backfilled in 2007, Menard has been selected to carry out ground compaction works. Following a soil testing campaign carried out in 2008, Menard [...]
Goya Foods warehouse and corporate headquarters, USA
coralielaval2022-11-28T15:40:28+01:00Goya Foods warehouse and corporate headquarters, USA The new warehouse and corporate headquarters (totalling 57,000 sq. metres) of Goya Foods required foundation soil improvement. Menard proposed a solution of installing more than 11,000 Controlled Modulus Columns (CMCs). At the site, construction had to contend with the presence of a former landfill and flooding [...]
O-Bahn city access project, Australia
coralielaval2022-11-28T15:32:10+01:00O-Bahn city access project, Australia The Australian teams implemented 58 jet grouting columns The columns were installed to stabilise the soil in the heart of Adelaide and to support the creation of priority lanes and a tunnel for the O-Bahn guided busway. Created in the mid-1980s to relieve traffic congestion in the city, [...]
Saigon Offshore Fabrication Engineering, Vietnam
coralielaval2022-11-28T15:26:56+01:00Saigon Offshore Fabrication Engineering, Vietnam SOFE is a recurrent client for Menard, as we have already carried out works on a similar 20 Ha area. This project concerned the Danish quay that was built two years ago by others, and which consisted on a 15 m wide slab on piles with a sheet [...]
Forth Replacement Crossing, United-Kingdom
coralielaval2022-11-28T15:22:24+01:00Forth Replacement Crossing, United-Kingdom NEARLY 4,500 CMCs UNDER THE ROAD Menard and its British subsidiary Vibro Menard won the contract to work on the Forth Replacement Crossing. The project, one of the United Kingdom’s largest currently under construction, involves a road suspension bridge with a metal deck over the Firth of Forth 15 [...]
Fisherman Island, Port of Brisbane, Queensland, Australia
coralielaval2022-11-28T15:17:00+01:00Fisherman Island, Port of Brisbane, Queensland, Australia In 2009 the largest single-stage treatment of Menard VacuumTM consolidation technique was installed as part of Port of Brisbane’s Fisherman Island expansion project. A significant increase of the Port of Brisbane capacity had been planned, by reclaiming an additional 235 ha of land. Further to the [...]
East port Saïd, Egypt
coralielaval2022-11-28T15:10:29+01:00Port Said, Egypt The Suez Canal has connected the Red Sea to the Mediterranean for the past century and a half. To accelerate economic development in the strategic region, a free trade zone is under construction in the East Industrial Area of Port Said, the undisputed hub of the eastern Mediterranean. In September [...]
Bus depot, Belfast, Irlande
coralielaval2022-11-28T15:05:04+01:00Helping to expand the public transport system in Belfast As part of the public transport upgrade project conducted by the city of Belfast, Menard won the contract awarded by Translink, the city transport company, to improve the ground under the future bus depot. The completed structure will be used to service and maintain [...]