Bypass Road Construction in Porto Nuevo, Benin
South Ring Road of Gdańsk, Poland
coralielaval2022-11-28T16:53:01+01:00The Ring Express road joins the existing 3-city Bypass (Gdańsk, Sopot and Gdynia) and the Highway A1 (Gdańsk – Katowice) in the North of Poland. Ground conditions This area had extremely bad soils conditions for road construction. There was very organic soil (peat and sludge) with high water content index. The thickness of [...]
Reconstruction of the national road No. 58, Poland
coralielaval2022-11-28T16:34:09+01:00Reconstruction of the national road No. 58, Poland Menard Polska was awarded ground improvement works for the modernization of the national road no. 58 between Stare Kiełonki and Zgon. Under the old road embankment, the soil were mainly made of organic materials such as peat and mud on a variable thickness (from 1 [...]
O-Bahn city access project, Australia
coralielaval2022-11-28T15:32:10+01:00O-Bahn city access project, Australia The Australian teams implemented 58 jet grouting columns The columns were installed to stabilise the soil in the heart of Adelaide and to support the creation of priority lanes and a tunnel for the O-Bahn guided busway. Created in the mid-1980s to relieve traffic congestion in the city, [...]
Forth Replacement Crossing, United-Kingdom
coralielaval2022-11-28T15:22:24+01:00Forth Replacement Crossing, United-Kingdom NEARLY 4,500 CMCs UNDER THE ROAD Menard and its British subsidiary Vibro Menard won the contract to work on the Forth Replacement Crossing. The project, one of the United Kingdom’s largest currently under construction, involves a road suspension bridge with a metal deck over the Firth of Forth 15 [...]
CTRL 310 in London, United-Kingdom
coralielaval2022-11-28T14:45:23+01:00CTRL 310 in London, United-Kingdom Part of the Channel Tunnel Rail Link (CTRL) is built on Controlled Modulus Columns. Menard suggested this technique to improve the soil along the Thames River in the suburbs of London so that the Eurostar could operate as intended. For this project, Menard used a short mast for [...]
Highways A71/A72, Germany
coralielaval2022-11-28T10:46:47+01:00Highways A71/A72, Germany The new alignment for the construction of A71 and A72 motorways in Germany had to go through areas where active collapse sinkholes could be encountered. A special application of Dynamic Compaction was developed for these projects by using very high-energy pounding with the patented MARS free fall system. Up to [...]
Fonyed highway, Hungary
coralielaval2022-11-28T10:32:38+01:00Fonyed highway, Hungary Dynamic Replacement pillars were proposed by Menard to improve more than 400,000 m² of peat and clay soils as deep as 10 m along Highway M7 near Lake Balaton. This solution was the most competitive and fastest way to ensure the embankment’s stability and to meet the strict differential settlement [...]
Infrastructural upgrade, Dunkettle, Ireland
coralielaval2022-04-05T17:25:49+02:00First PVD and CMC for Menard in Dunkettle, Ireland
E20 Warehouse area, Solrød Strand, Denmark
Sophie Fromion2022-04-05T17:27:17+02:00Ground improvement at Solrød Strand, Denmark